Field Log
Dated entries from our records: what changed, what we observed, what is unfinished.
Published 2026-11-08. Entry dates are event dates.
- 2026-11-08. Full five-minute watch, corrected physics: two walkers each survived one full watch without a fall (75% and 87.6% qualified standing). Our bar is 90%. Other trials fell. Not yet qualified.
- 2026-11-08. Ship-to-robot motion corrected after our own review found reversed signs, then checked independently. Earlier footage predates the correction.
- 2026-11-08. Submarine model accepted: trim, diving planes, and screws that drive only in water.
- 2026-11-08. Obstacle course on unseen fields: 1 of 24 attempts lasted the full 40 seconds; 23 fell. Unfinished: a walker that finishes reliably.
- 2026-11-07. Stride training raised foot clearance from 6.2 to 10.2 cm and step length from 17.5 to 21.8 cm. Unfinished: the 15 cm clearance target.
- 2026-10-16. A village generated from three recorded days of ten people; rendered at three fidelity levels and ported to our own engine.